House Construction Cost Estimator Pakistan

Get a realistic construction budget for your house. Enter the covered area, choose a construction quality tier, set the number of floors, and adjust the per-square-foot rates to match your city.

Project Inputs
Total covered area of all floors combined.
Extra floors add foundation and structure cost.
Buffer for price changes — 10 to 15% is typical.

Per sq ft rates (Rs — editable)

Cost Breakdown
ItemAmount (Rs)
Grey structure—
Finishing—
Floor factor—
Subtotal—
Contingency (10%)—
Estimated total—
Cost per sq ft (covered area)
—
Covered area
—
Note: These are budget estimates only. Construction rates vary by city and material prices change often. Always get written quotes from at least two local contractors before starting work.
What each tier includes
Work itemGrey structureStandardPremium
Foundation, walls, RCC slab, roofYesYesYes
Basic plasterYesYesYes
Flooring and tilesNoYesYes (imported options)
PaintNoYes (standard)Yes (premium)
Electrical fixtures and fittingsNoYes (local brands)Yes (branded)
Sanitary ware and kitchen fittingsNoYes (local brands)Yes (branded)
Doors and windowsNoYes (basic)Yes (solid / designer)
Ceiling and lighting designNoBasicYes (false ceiling)

How it is calculated

Structure cost = covered area × grey rate. Finishing cost = covered area × (tier rate − grey rate); for the grey tier the finishing cost is zero. The floor factor adds 8% of the combined cost per extra floor beyond the ground floor. Contingency = subtotal × your contingency percent, and the estimated total = subtotal + contingency.

Everything runs in your browser; no data is uploaded or stored.