WAPDA Demand Notice Estimator Pakistan
Estimate the cost of a new electricity connection before your DISCO issues the demand notice: service-line charges, security deposit and meter cost.
Indicative rates (Rs) — edit to match your DISCO:
All figures are indicative estimates only — the actual demand notice is issued by your DISCO after a survey.
Indicative demand notice total
Enter your connection details above.
Itemized estimate
| Item | Calculation | Amount (Rs) |
|---|
All figures indicative only. Your DISCO may add further charges such as line extension or pole installation costs after the site survey.
How to use
- Select the connection type and enter your sanctioned load in kW and the service-line distance in meters.
- Choose urban or rural — service-line rates differ between the two.
- Adjust any rate field to match the latest rates from your DISCO, and the itemized estimate updates live.
- Take the total as a planning figure only — pay only against the official demand notice issued by your DISCO after the survey.
Notes: Indicative estimates only. Connection types above 5 kW generally use a three-phase meter. Actual charges vary between DISCOs and change over time.