Azlaan Electric AC Solar Center — Solar, CCTV, AC & electrical work, Faisalabad Call: 0300-8987448

WAPDA New Connection Cost Estimator

Enter all costs of a new electricity connection in one worksheet — demand notice, security deposit, meter, cable and service line — and get the total estimate.

Enter the load and costs — the total estimate will appear here.

How to use

  1. Enter your sanctioned load in kW — the security deposit will be calculated automatically from it.
  2. Adjust the demand notice, meter, cable (length x rate), service line and inspection charges according to your DISCO estimate.
  3. See the total estimate below with a breakdown of each item.

This is an itemised worksheet, not a live official fee lookup: the real demand notice is issued by your DISCO (LESCO, IESCO, MEPCO etc.) after a survey and based on your load, and in remote areas the service line cost can be much higher. Rates change — verify with the official source before relying on this. All rate fields on this page are editable estimates prefilled with commonly published values, not a live official lookup.